Project
The relocation of oil pipelines which run below the Segno riverbed to reduce environmental risks in the event of flooding. The existing pipelines will be repositioned and connected directly to the wharves and to Vado Gateway container terminal.
(Last refresh date December 2024)
Project site
Key project data
Project Reference Number | P.644 - Rerouting of Oil Pipelines along the Segno River by the Port of Vado Ligure |
---|---|
Status | |
Total cost | 8,225,108.00€ |
Activities | Executive design |
Timeline |
Start of works date
1st quarter 2023 Projected completion date 4th quarter 2024 |
Contractor |