Project

The relocation of oil pipelines which run below the Segno riverbed to reduce environmental risks in the event of flooding. The existing pipelines will be repositioned and connected directly to the wharves and to Vado Gateway container terminal.

(Last refresh date December 2024)

Project site

Key project data

Project Reference Number P.644 - Rerouting of Oil Pipelines along the Segno River by the Port of Vado Ligure
Status
Total cost 8,225,108.00€
Activities Executive design
Timeline Start of works date 1st quarter 2023
Projected completion date 4th quarter 2024