The project foresees the installation shoreside of electric power converters for the provision of cold ironing at 6 passenger berths in the Port of Genoa to reduce air and noise pollution.
(Last refresh date 03.10.2023)
The project foresees the installation shoreside of electric power converters for the provision of cold ironing at 6 passenger berths in the Port of Genoa to reduce air and noise pollution.
(Last refresh date 03.10.2023)
Project Code | P.2946 |
---|---|
Project title | Genoa cruise and ferry cold ironing |
Project status | Project status key TFFS = Technical and Financial Feasibility Study, DD = Detailed Design, ED = Executive Design,
![]() ![]() |
Project value | €20,000,000.00 |
Current activities | Executive Design |
Timeline |
Start Date:
October 2023 Completion Date: December 2024 |
Contractor | ![]() |
Gallery |