The project includes the enhancement of quay load capacity, construction of crane runways, installation of hydraulic and electric power network and new terminal lighting system in the new container terminal.
(Last refresh date 15.01.2024)
The project includes the enhancement of quay load capacity, construction of crane runways, installation of hydraulic and electric power network and new terminal lighting system in the new container terminal.
(Last refresh date 15.01.2024)
Project Code | P.3105 |
---|---|
Project title | Infrastructure upgrade of the new Bettolo Container Terminal |
Project status | Project status key TFFS = Technical and Financial Feasibility Study, DD = Detailed Design, ED = Executive Design, Activity completed Activity in progress
|
Project value | € 10,364,000.00 |
Current activities | Call for integrated tenders |
Timeline |
Start Date:
May 2023 Completion Date: December 2024 |
Contractor | |
Gallery |