Spinelli Genoa Port Terminal takes delivery of new mega-crane

On the equipment front, Spinelli starts off the new year with the delivery of a mega mobile harbour crane. The terminal’s cargo-handling equipment will now feature a new Terex Gottwald Model G HMK 8610, which will operate alongside the existing nine mobile cranes serving the large container vessels that dock at Genoa Port Terminal.

Bolstered by a 4-million euro investment programme, the Spinelli Group offers a new powerful 150 t.-capacity crane, with an outreach of 56 metres and a maximum lifting speed of 100 metres/minute.

Share on  Facebook Share on  X Share on  Linkedin