Project
The project calls for the installation of shoreside power facilities for cruise vessels docking at Savona’s Cruise Terminal. The ships will be able to switch off the generators and plug into an electrical power grid to reduce carbon emissions and noise pollution.
(Last refresh date December 2024)
Project site
Key project data
Project Reference Number | P.783 - On-shore Power Supply at the Cruise Terminal in Savona |
---|---|
Status | |
Total cost | 10,100,000.00€ |
Activities | Works underway |
Timeline | Start of works date October 2023 Projected completion date December 2025 |
Contractor | Nidec ASI S.P.A. |