Project
The project foresees the installation of a 130 k/W HV/MV converter to supply shoreside power simultaneously to ships calling at the port, thereby equipping the vessels with the opportunity to switch off the generators and plug into a shoreside electrical power grid, with a sharp reduction in carbon emissions and greenhouse gases. The added module will complete the provision of onshore power supply already underway at the cruise and ferry passenger port, and will be extended to the cargo terminals across the Sampierdarena basin.
Project site
Key project data
| Project Reference Number | 3189 – Add-on Module Onshore Power Supply Genoa |
|---|---|
| Status | |
| Total cost | 32,000,000.00€ |
| Activities | Project plan |

